Service Type
Change Order Estimating
A change order needs the same discipline as the original bid: measured quantities against the actual scope change, not a round-number guess.
What it is
Change order pricing quantifies exactly what's different between the original scope and the revised scope — added or deleted work, a substituted material, a design revision — and prices that delta the same way the original estimate was built, so the number is defensible if an owner or GC pushes back on it.
When to ask for this
Ask for change order estimating whenever scope shifts after award: an RFI response that changes a detail, an owner-requested addition, a field condition that wasn't on the original drawings. A number built from measured quantities holds up in negotiation in a way a round-number allowance doesn't.
Available for every trade we cover
Change Order Estimating isn’t limited to one trade — request it for a single scope or a full multi-trade bid package.
Turnaround
Same day to 48 hours depending on scope
What ships in the deliverable
- Quantities for the delta scope only, isolated from the original bid
- Side-by-side comparison against the original estimate where relevant
- Marked-up drawings or RFI references showing what changed
- Same-day turnaround available for time-sensitive field changes
Other service types
Quantity Takeoff
The full count and measure of every item of work on the drawings — the foundation every estimate is built on.
Material Takeoff
Quantities converted into an actual purchase list — the sheet sizes, lengths and units you'd hand to a supplier.
Bid Estimating
A full, priced estimate built to go straight into a competitive bid — quantities, pricing and a bottom line.
Bid more. Win more.
Stop turning down invitations to bid because the takeoff will not get done in time. Send us the plans and get your numbers back in 24–72 hours.
Pay only after you approve the quote · Free revisions until bid day · NDA available
Or email an estimator directly →
